RPA0001

 

- RPA Rail Plant Maintenance & Repair Competency Assessment 2016 - Issue 3

RPA Rail Plant Maintenance & Repair Competency Assessment 2016 - Issue 3

 

The RPA Rail Plant Maintenance & Repair Competency Assessment 2016 - Issue 3 is now available to purchase from the RPA Office.



 

The RPA RPMRCA 2016 is priced at:



 

£250.00 - RPA Members


£500.00 - Non RPA Members

 

The RPA Rail Plant Maintenance & Repair Competency Assessment 2016 includes:



 

  • RPA RPMRCA 2016 - Assessor Guidance Document

  • RPA RPMRCA 2016 - Candidate Copy

  • RPA RPMRCA 2016 - Assessor Copy 



 

 


 

To order your copy please email a purchase order to rpa@cpa.uk.net 

RPA0002

 

Good Practice Guide for 

On-Track Plant Operations Scheme (POS) Site Documentation

This Good Practice Guide details the minimum OTP Workplan site documentation required when working under the Network Rail On-track Plant Operations Scheme to be used by POS Representatives and Machine/Crane controllers.

 

It covers activities carried out by on track plant (OTP) and civil construction plant (where appropriate)

 

Documentation included in this Good Practice Guide includes: (Click on the document number in RED to download) 

 

 

 

Template No

 

POS Rep Front Cover

RPA0002/1

 

MC/CC Front Cover

RPA0002/2

1a

Site diagrams (Provided by Principal Contractor)

N/A

1b

Site specific hazard ID & control measures

RPA0002/3

1c

RRAP assessment

RPA0002/4

1d

Site bar chart (Provided by Principal Contractor, Highlighting high risk plant activities)

N/A

2

MC/CC Check list (COP0016/NR/L3/NDS/047/TMC08/F015)

RPA0002/5

3

Task Briefing Sheets

RPA0002/6

4

Plant & Attachment list

RPA0002/7

5

Site Contacts

RPA0002/8

6

Movements without a MC (Send & Receive) arrangements

RPA0002/9

7

Assessment, more than 1 OTP per Machine Controller

RPA0002/10

8

ALO Plan (Provided by Principal Contractor)

N/A

9

Plant Collection & Delivery Plan

RPA0002/11

10a

Schedule of Lifts

RPA0002/12

10b

Lift Plans

N/A

10c

Slinging index

RPA0002/13

10d

Unplanned/amended lift info sheet

RPA0002/14

11

Plant Assurance Report Form

RPA0002/15

12

Close Call report sheets

N/A

13

Contingency Arrangements

N/A

14

Communication Contingency

RPA0002/16

15

Appendences

 

16

Emergency Arrangements

RPA0002/17

 

 

 

 


 

 

 

RPA 0003 - 

Good Practice Guide for Safe Replenishing of Fluids on On-track and Civils Plant

RPA 0003 - Good Practice Guide for Safe Replenishing of Fluids on On-track and Civils Plant

 

A sub-group of the Rail Plant Association have, in light of reported incidents, looked at the activity of refuelling mobile plant. The mobile plant types range from On-track Plant (OTP) to Civils plant. To help reduce incidents whilst undertaking this or other fluid replenishment activities, the Rail Plant Association recommends this document as good practice for the industry.

 

 

 

 

RPA 0005 - 

Good Practice Guidance for POS Rep Competence


 

 

RPA 0005 - Good Practice Guide for POS Rep Competence

 

 

A sub-group of the Rail Plant Association have looked at On-track Plant Operations Scheme (POS) Representative Competence requirements.  

 

The Rail Plant Association recommends this document as good practice for the industry.

 

The Good Practice Guide gives the minimum requirements for On-track Plant Operations Scheme (POS) Representative Competence and is applicable for the selection, training, mentoring, assessment and development of competence for POS Representatives.

 

 


 

RPA0008 - Good Practice Risk Assessment - Managing an Exhibition or Show

This RPA Risk Assessment Template is provided to assist Members exhibiting products and services at exhibitions and shows. 

 

Follow CPA on FacebookFollow CPA on TwitterConnect with the CPA on LinkedInConnect with CPA Bulletin on LinkedInPayments on the CPA web site are secured by SagePay